Diesel Data: Automotive Repair

Inspection








U250E AUTOMATIC TRANSMISSION / TRANSAXLE: PARK / NEUTRAL POSITION SWITCH: INSPECTION

INSPECTION

1. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY





(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:





If the operation cannot be done as specified, replace the park/neutral position switch.