Installation
P112 HYBRID BATTERY CONTROL: BATTERY BLOWER: INSTALLATION
INSTALLATION
1. INSTALL BATTERY BLOWER
(a) Connect the connector to the battery blower.
(b) Install the clamp on the battery blower.
(c) Install the battery blower with the 3 nuts.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
2. INSTALL VENTILATOR DUCT INNER
(a) Install the ventilator duct inner with the 3 clips.
3. INSTALL NO. 2 QUARTER VENT DUCT INNER Installation
4. INSTALL DECK TRIM SIDE PANEL RH Installation
5. INSTALL REAR SIDE SEAT BACK FRAME RH Installation
6. INSTALL REAR NO. 1 FLOOR BOARD Installation
7. INSTALL REAR SEAT CUSHION ASSEMBLY Installation
8. INSTALL TONNEAU COVER Installation
9. INSTALL REAR DECK TRIM COVER Installation
10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL Installation
11. INSTALL REAR NO. 3 FLOOR BOARD Installation
12. INSTALL REAR DECK FLOOR BOX Installation
13. INSTALL REAR NO. 2 FLOOR BOARD Installation
14. PERFORM INITIALIZATION
(a) Perform initialization Repair Instruction - Initialization.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.