Diesel Data: Automotive Repair

Installation








1NZ-FXE EMISSION CONTROL: PURGE FLOW SWITCHING VALVE: INSTALLATION

INSTALLATION

1. INSTALL PRESSURE SWITCHING VALVE





(a) Install the pressure switching valve with the bolt.
Torque: 2.9 Nm (30 kgf-cm, 26 in-lbf)





(b) Connect the 3 canister hoses to the pressure switching valve.
(c) Connect the pressure switching valve.
2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL Installation
3. INSTALL REAR NO. 3 FLOOR BOARD Installation
4. INSTALL REAR DECK FLOOR BOX Installation
5. INSTALL REAR NO. 2 FLOOR BOARD Installation
6. PERFORM INITIALIZATION
(a) Perform initialization Repair Instruction - Initialization.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.