Installation
1NZ-FXE IGNITION: IGNITION COIL: INSTALLATION
INSTALLATION
1. INSTALL IGNITION COIL ASSEMBLY
(a) Install the 4 ignition coils with the 4 bolts.
Torque: 9.0 Nm (92 kgf-cm, 80 in-lbf)
(b) Connect the 4 ignition coil connectors.
2. INSTALL ENGINE ROOM NO. 2 RELAY BLOCK
(a) Install the relay block with the 2 bolts.
Torque: 8.4 Nm (86 kgf-cm, 74 in-lbf)
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
4. INSTALL REAR NO. 3 FLOOR BOARD Installation
5. INSTALL REAR DECK FLOOR BOX Installation
6. INSTALL REAR NO. 2 FLOOR BOARD Installation
7. PERFORM INITIALIZATION
(a) Perform initialization Repair Instruction - Initialization.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.