Installation
2GR-FE COOLING: THERMOSTAT: INSTALLATION
INSTALLATION
1. INSTALL THERMOSTAT
(a) Install a new gasket to the thermostat.
(b) Install the thermostat with the jiggle valve facing up.
HINT: The jiggle valve may be set within 10° on either side of the prescribed position.
2. INSTALL WATER INLET
(a) Install the water inlet with the 2 nuts.
Torque: 10 Nm (102 kgf-cm, 7ft-lbf)
3. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY Installation
4. CONNECT NO. 2 RADIATOR HOSE
(a) Connect the No. 2 radiator hose to the water inlet.
5. INSTALL V-RIBBED BELT Installation
6. ADD ENGINE COOLANT Service and Repair
7. INSPECT FOR COOLANT LEAK Testing and Inspection
8. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
9. INSTALL FRONT FENDER APRON RH
10. INSTALL FRONT FENDER LINER RH
11. INSTALL NO. 2 ENGINE UNDER COVER
12. INSTALL NO. 1 ENGINE UNDER COVER
13. INSTALL FRONT WHEEL RH