Diesel Data: Automotive Repair

Installation








2GR-FE EMISSION CONTROL: PURGE VALVE: INSTALLATION

INSTALLATION

1. INSTALL NO. 1 VACUUM SWITCHING VALVE





(a) Install the No. 1 vacuum switching valve with the bolt.
Torque: 10 Nm (102 kgf-cm, 7ft-lbf)





(b) Connect the 2 fuel vapor feed hoses to the No. 1 vacuum switching valve.
(c) Connect the wire harness clamp.
(d) Connect the No. 1 vacuum switching valve connector.
2. INSTALL V-BANK COVER SUB-ASSEMBLY Installation