Installation
2GR-FE EMISSION CONTROL: PCV VALVE: INSTALLATION
INSTALLATION
1. INSTALL VENTILATION VALVE SUB-ASSEMBLY
(a) Apply adhesive to 2 or 3 threads of the ventilation valve sub-assembly.
Text in Illustration
Adhesive:
Toyota genuine adhesive 1324, three bond 1324 or equivalent
(b) Using a 19 mm deep socket wrench, install the ventilation valve sub-assembly.
Torque: 27 Nm (275 kgf-cm, 20ft-lbf)
(c) Connect the ventilation hose to the ventilation valve sub-assembly.
2. INSTALL V-BANK COVER SUB-ASSEMBLY Installation