Integration Relay
1NZ-FE COOLING: INTEGRATION RELAY: INSPECTION
INSPECTION
1. INSPECT INTEGRATION RELAY
(a) Inspect the cooling fan relay.
(1) Using an ohmmeter, measure the resistance between the terminals.
Standard resistance:
NOTE: While using the battery for the inspection, do not bring the positive and negative tester probes too close to each other as a short circuit may occur.