Installation
C59 MANUAL TRANSMISSION / TRANSAXLE: BACK-UP LIGHT SWITCH: INSTALLATION
1. INSTALL BACK-UP LIGHT SWITCH ASSEMBLY
(a) Using SST, install the back-up light switch and a new gasket to the transaxle case.
SST : 09817-16011
Torque : 40 Nm (410 kgf-cm, 30 ft-lbf)
(b) Install the 2 clamps.
NOTICE:
Be sure to use boss B.
(c) Connect the back-up light switch connector.
2. CONNECT TRANSMISSION CONTROL SHIFT CABLE
(a) Connect the transmission control shift cable with the clip*1.
(b) Connect the transmission control shift cable with a new clip*2.
3. INSTALL AIR CLEANER CASE Installation
4. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation
5. INSTALL NO. 2 CYLINDER HEAD COVER Installation