Diesel Data: Automotive Repair

A/T Clutch Pressure Control Solenoid Valve C Replacement




A/T Clutch Pressure Control Solenoid Valve C Replacement

1. Do the battery removal procedure Procedures.

2. Remove the auxiliary under-hood fuse/relay box from its bracket, and remove the bracket from the battery base.

3. Remove the intake air duct and the air cleaner housing.

4. Remove the battery base and the battery base bracket.

5. Disconnect the A/T clutch pressure control solenoid valve C connector (A).





6. Remove A/T clutch pressure control solenoid valve C (B).

7. Remove the ATF feed pipes (C), the O-rings (D), the ATF pipe (E), and the gasket (F).

8. Clean the mounting surfaces and the fluid passages of the transmission housing.

9. Install the 8 x 53 mm ATF feed pipe (A) with the filter end into its mounting hole (B).






10. Check the height (A) of the 8 x 53 mm ATF feed pipe (B) between the top (C) of the pipe and the solenoid valve body mounting surface (D). The height is about 7.0 mm (0.3 in). If the height is over 7.0 mm (0.3 in), push the pipe until it bottoms in the accumulator body.






11. Install a new gasket (A) on the transmission housing, and install the 8 x 36 mm ATF feed pipe (B) with the filter end into the transmission housing and the 8 x 25.2 mm ATF pipe (D).





12. Install new O-rings (E) over the ATF feed pipes.

13. Install A/T clutch pressure control solenoid valve C.

14. Check the connector for rust, dirt, or oil, and clean or repair if necessary, then connect the connector securely.

15. Install the battery base bracket and the battery base.

16. Install the air cleaner housing and the intake air duct.

17. Install the auxiliary under-hood fuse/relay box on the battery base, and install the fuse/relay box on its bracket.

18. Do the battery installation procedure Procedures.