Installation
2GR-FE COOLING: THERMOSTAT:
INSTALLATION
1. INSTALL THERMOSTAT
(a) Install a new gasket to the thermostat.
(b) Install the thermostat with the jiggle valve facing up.
HINT: The jiggle valve may be set within 10°on either side of the prescribed position.
2. INSTALL WATER INLET
(a) Install the water inlet with the 2 nuts .
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
3. CONNECT RADIATOR HOSE OUTLET (Installation)
4. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY (Installation)
5. INSTALL V-RIBBED BELT (Installation)
6. INSTALL ENGINE MOVING CONTROL ROD SUB-ASSEMBLY (Installation)
7. INSTALL NO. 2 ENGINE MOUNTING STAY RH (Installation)
8. INSTALL FRONT FENDER APRON SEAL RH
9. ADD ENGINE COOLANT (Testing and Inspection)
10. CHECK FOR ENGINE COOLANT LEAKS (Testing and Inspection)
11. INSTALL V-BANK COVER SUB-ASSEMBLY (Installation)