Installation
2GR-FE IGNITION: IGNITION COIL:
INSTALLATION
1. INSTALL IGNITION COIL ASSEMBLY
(a) Install the 6 ignition coils with the 6 bolts.
Torque: 10 Nm (102 kgf-cm, 10 ft-lbf)
(b) Connect the 6 ignition coil connectors.
2. INSTALL NO. 1 SURGE TANK STAY
(a) Install the No. 1 surge tank stay with the bolt.
Torque: 21 Nm (214 kgf-cm, 15 ft-lbf)
NOTE: Make sure that there is no oil on the bolt threads.
(b) Install the bolt and clamp.
Torque: 7.0 Nm (71 kgf-cm, 62 in-lbf)
3. INSTALL INTAKE AIR SURGE TANK ASSEMBLY (Installation)
4. INSTALL AIR CLEANER CAP SUB-ASSEMBLY (Installation)
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (Installation)
6. ADD ENGINE COOLANT (Testing and Inspection)
7. CHECK FOR ENGINE COOLANT LEAKS (Testing and Inspection)
8. INSTALL COWL TOP PANEL OUTER SUB-ASSEMBLY (Installation)
9. INSTALL WINDSHIELD WIPER LINK ASSEMBLY
(Installation)
10. INSTALL V-BANK COVER SUB-ASSEMBLY (Installation)