Installation
2GR-FE CHARGING: GENERATOR:
INSTALLATION
1. INSTALL GENERATOR ASSEMBLY
(a) Install the bracket with the bolt.
Torque: 20 Nm (204 kgf-cm, 15 ft-lbf)
(b) Install the wire harness clamp stay.
Torque: 8.4 Nm (86 kgf-cm, 74 in-lbf)
(c) Connect the wire harness clamp.
(d) Install the generator assembly to the cylinder block with the bolt.
Torque: 20 Nm (204 kgf-cm, 15 ft-lbf)
(e) Install the 2 bolts.
Torque: 43 Nm (438 kgf-cm, 32 ft-lbf)
(f) Connect the generator connector to the generator assembly.
(g) Install the generator wire with the nut.
Torque: 9.8 Nm (100 kgf-cm, 87 in-lbf)
(h) Install the terminal cap.
(i) Connect the 2 wire harness clamps.
(j) Connect the magnetic clutch connector to the compressor and magnetic clutch.
2. INSTALL V-RIBBED BELT (Installation)
3. INSTALL RADIATOR ASSEMBLY (Installation)
4. INSTALL FAN SHROUD (Installation)
5. INSTALL RADIATOR SUPPORT UPPER (Installation)
6. CONNECT NO. 1 OIL COOLER OUTLET TUBE (Installation)
7. CONNECT NO. 1 OIL COOLER INLET TUBE (Installation)
8. CONNECT RADIATOR OUTLET HOSE (Installation)
9. CONNECT RADIATOR INLET HOSE (Installation)
10. CONNECT RADIATOR RESERVE TANK HOSE (Installation)
11. INSTALL FRONT BUMPER ENERGY ABSORBER (Reassembly)
12. INSTALL FRONT BUMPER ASSEMBLY (w/o Fog Light) (Installation)
13. INSTALL FRONT BUMPER ASSEMBLY (w/ Fog Light) (Installation)
14. INSTALL NO. 1 AIR CLEANER INLET (Installation)
15. INSTALL AIR CLEANER CAP SUB-ASSEMBLY (Installation)
16. INSTALL AIR CLEANER INLET ASSEMBLY (Installation)
17. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (Installation)
18. ADD ENGINE COOLANT (Testing and Inspection)
19. CHECK FOR ENGINE COOLANT LEAKS (Testing and Inspection)
20. INSTALL V-BANK COVER SUB-ASSEMBLY (Installation)
21. INSTALL COOL AIR INTAKE DUCT SEAL (Installation)
22. INSTALL FRONT FENDER APRON SEAL RH
23. INSTALL ENGINE UNDER COVER RH
24. INSTALL ENGINE UNDER COVER LH
25. INSTALL FRONT WHEEL OPENING EXTENSION PAD RH
26. REMOVE FRONT WHEEL OPENING EXTENSION PAD LH
27. INSTALL FRONT WHEEL RH (Installation)