Installation
NAVIGATION: MULTI-DISPLAY:
INSTALLATION
1. INSTALL MULTI-DISPLAY ASSEMBLY
(a) Connect the connector and install the multi-display.
(b) Install the 2 bolts.
2. INSTALL NO. 4 INSTRUMENT PANEL REGISTER ASSEMBLY (Installation)
3. INSTALL NO. 2 INSTRUMENT PANEL REGISTER ASSEMBLY (Installation)
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
5. PERFORM INITIALIZATION
(a) Perform initialization (Repair Instruction - Initialization).
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.