Diesel Data: Automotive Repair

Removal








3MZ-FE ENGINE CONTROL SYSTEM: THROTTLE BODY:

REMOVAL

1. DRAIN ENGINE COOLANT (Service and Repair)

2. REMOVE FRONT SUSPENSION UPPER BRACE CENTER
(a) Remove the 2 nuts and upper brace.
3. REMOVE V-BANK COVER SUB-ASSEMBLY





(a) Using a 5 mm socket hexagon wrench, remove the 3 nuts.
(b) Remove the V-bank cover.
4. REMOVE AIR CLEANER INLET ASSEMBLY
5. REMOVE AIR CLEANER ASSEMBLY
6. REMOVE INTAKE AIR RESONATOR





(a) Remove the ventilation hose No. 2.
(b) Remove the fuel vapor feed hose from the 2 hose clamps.
(c) Loosen the air cleaner hose clamp bolt, and then remove the intake air resonator.
7. REMOVE THROTTLE BODY ASSEMBLY





(a) Disconnect the throttle control motor & throttle position sensor connector.
(b) Disconnect the water by-pass hose No. 2.
(c) Disconnect the water by-pass hose No. 3.





(d) Remove the 2 bolts, 2 nuts and throttle body.
(e) Remove the gasket.