Installation
2AZ-FE COOLING: THERMOSTAT: INSTALLATION
INSTALLATION
1. INSTALL THERMOSTAT
(a) Install a new gasket onto the thermostat.
(b) Install the thermostat with the jiggle valve upward.
HINT: The jiggle valve may be set to within 10° on either side of the prescribed position.
2. INSTALL WATER INLET
(a) Install the water inlet with the 2 nuts.
Torque: 9.0 Nm (92 kgf-cm, 80in-lbf)
3. CONNECT RADIATOR HOSE OUTLET Installation
4. ADD ENGINE COOLANT Testing and Inspection
5. INSPECT FOR COOLANT LEAK Testing and Inspection
6. INSTALL ENGINE UNDER COVER LH
7. INSTALL ENGINE UNDER COVER RH
8. INSTALL FRONT WHEEL OPENING EXTENSION PAD LH
9. INSTALL FRONT WHEEL OPENING EXTENSION PAD RH