Installation
2GR-FE COOLING: THERMOSTAT: INSTALLATION
INSTALLATION
1. INSTALL THERMOSTAT
(a) Install a new gasket to the thermostat.
(b) Install the thermostat with the jiggle valve facing up.
HINT: The jiggle valve may be set within 10°on either side of the prescribed position.
2. INSTALL WATER INLET
(a) Install the water inlet with the 2 nuts.
Torque: 10 Nm (102 kgf-cm, 7ft-lbf)
3. CONNECT RADIATOR HOSE OUTLET Installation
4. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY Installation
5. INSTALL V-RIBBED BELT Installation
6. INSTALL ENGINE MOVING CONTROL ROD SUB-ASSEMBLY Installation
7. INSTALL NO. 2 ENGINE MOUNTING STAY RH Installation
8. INSTALL FRONT FENDER APRON SEAL RH
9. ADD ENGINE COOLANT Testing and Inspection
10. CHECK FOR ENGINE COOLANT LEAKS Testing and Inspection
11. INSTALL V-BANK COVER SUB-ASSEMBLY Installation