Installation
2ZR-FE COOLING: THERMOSTAT: INSTALLATION
INSTALLATION
1. INSTALL THERMOSTAT
(a) Install a new gasket on the thermostat.
(b) Install the thermostat to the water inlet with the jiggle valve upward.
HINT: The jiggle valve may be set to within 10° on either side of the indicated position.
2. INSTALL WATER INLET
(a) Install the water inlet with the 2 nuts.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
3. ADD ENGINE COOLANT Service and Repair
4. INSPECT FOR COOLANT LEAK Testing and Inspection