Installation
2ZR-FE BATTERY / CHARGING: GENERATOR: INSTALLATION
INSTALLATION
1. INSTALL GENERATOR ASSEMBLY
(a) Install the wire harness clamp bracket with the bolt.
Torque: 8.4 Nm (86 kgf-cm, 74 in-lbf)
(b) Temporarily install the generator assembly with the 2 bolts.
(c) Install the generator connector and wire harness clamp.
(d) Install the wire harness to terminal B with the nut and install the terminal cap.
Torque: 9.8 Nm (100 kgf-cm, 87 in-lbf)
2. INSTALL V-RIBBED BELT Installation
3. ADJUST V-RIBBED BELT Installation
4. INSPECT V-RIBBED BELT Testing and Inspection
5. INSTALL ENGINE UNDER COVER RH
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL