Installation
U250E AUTOMATIC TRANSMISSION / TRANSAXLE: TRANSMISSION WIRE: INSTALLATION
INSTALLATION
1. INSTALL TRANSMISSION WIRE
(a) Coat a new O-ring of the transmission wire connector with ATF WS and install it to the transmission wire.
(b) Install the transmission wire with the bolt.
Torque: 5.4 Nm (55 kgf-cm, 48 in-lbf)
(c) Connect the transmission wire connector.
2. CONNECT TRANSMISSION WIRE
(a) Coat the O-ring of the ATF temperature sensor with ATF WS.
(b) Install the ATF temperature sensor with the lock plate and bolt.
Torque: 6.6 Nm (67 kgf-cm, 58 in-lbf)
(c) Connect the transmission wire to the 7 shift solenoid valve connectors.
3. INSTALL AUTOMATIC TRANSAXLE OIL PAN SUB-ASSEMBLY
(a) Install the 2 magnets in the oil pan.
(b) Apply adhesive or equivalent to 18 bolts.
Adhesive:
Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent
(c) Using a new gasket, install the oil pan to the transaxle case with the 18 bolts.
Torque: 7.8 Nm (80 kgf-cm, 69 in-lbf)
NOTE: Since the bolts are seal bolts, apply adhesive to the bolts and tighten them within 10 minutes of application.
4. INSTALL TRANSMISSION OIL FILLER TUBE SUB-ASSEMBLY Installation
5. INSTALL BATTERY CARRIER Installation
6. INSTALL BATTERY Installation
7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL Installation
8. INSTALL ENGINE UNDER COVER LH
9. ADD AUTOMATIC TRANSAXLE FLUID
10. INSPECT TRANSAXLE FLUID LEVEL Procedures