Installation
P112 HYBRID BATTERY CONTROL: FRAME WIRE: INSTALLATION
INSTALLATION
1. INSTALL NO. 2 FRAME WIRE
CAUTION: Wear insulating gloves.
(a) Install the No. 2 frame wire with new 26 nuts.
Torque: 5.4 Nm (55 kgf-cm, 48 in-lbf)
(b) Connect the No. 2 frame wire connector to the battery ECU, then connect the clamp.
(c) Connect the temperature sensor connector to the battery ECU.
2. INSTALL NO. 2 MAIN BATTERY CABLE Installation
3. INSTALL MAIN BATTERY CABLE Installation
4. INSTALL NO. 3 BATTERY CARRIER CUSHION Installation
5. INSTALL NO. 1 WIRE HARNESS PROTECTOR COVER Installation
6. INSTALL NO. 3 WIRE HARNESS PROTECTOR COVER Installation
7. INSTALL BATTERY COVER Reassembly
8. INSTALL HV BATTERY ASSEMBLY
(a) Install the HV battery to the vehicle Installation.
9. INSTALL SERVICE PLUG GRIP Installation
10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL Installation
11. INSTALL REAR NO. 3 FLOOR BOARD Installation
12. INSTALL REAR DECK FLOOR BOX Installation
13. INSTALL REAR NO. 2 FLOOR BOARD Installation
14. PERFORM INITIALIZATION
(a) Perform initialization Repair Instruction - Initialization.
NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.