Diesel Data: Automotive Repair

Installation








2GR-FE BATTERY / CHARGING: GENERATOR: INSTALLATION

INSTALLATION

1. INSTALL GENERATOR ASSEMBLY





(a) Install the wire harness clamp with the bolt.
Torque: 8.4 Nm (86 kgf-cm, 74in-lbf)





(b) Install the generator bracket with the 2 bolts.
Torque: 20 Nm (204 kgf-cm, 15ft-lbf)
(c) Connect the wire harness clamp.





(d) Install the 2 bolts.
Torque: 43 Nm (438 kgf-cm, 32ft-lbf)





(e) Connect the generator connector to the generator assembly.
(f) Install the generator wire with the nut.
Torque: 9.8 Nm (100 kgf-cm, 87in-lbf)
(g) Install the terminal cap.
(h) Connect the 2 wire harness clamps.
(i) Connect the magnetic clutch connector to the compressor and magnetic clutch.
2. INSTALL V-RIBBED BELT
HINT: Installation

3. INSTALL RADIATOR ASSEMBLY
HINT: Installation

4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.