Installation
1AR-FE COOLING: THERMOSTAT: INSTALLATION
INSTALLATION
1. INSTALL THERMOSTAT
(a) Install a new gasket to the thermostat.
(b) Install the thermostat with the jiggle valve facing upward.
HINT: The jiggle valve may be set to within 10° on either side of the prescribed position.
2. INSTALL WATER INLET
(a) Install the water inlet with the 2 nuts.
Torque: 10 Nm (102 kgf-cm, 7ft-lbf)
3. CONNECT NO. 2 RADIATOR HOSE Installation
4. INSTALL GENERATOR ASSEMBLY Installation
5. INSTALL WIRE HARNESS CLAMP BRACKET Installation
6. INSTALL V-RIBBED BELT
HINT: Installation
7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
8. ADD ENGINE COOLANT Service and Repair
9. INSPECT FOR COOLANT LEAK Replacement
10. INSTALL COOL AIR INTAKE DUCT SEAL Installation
11. INSTALL NO. 1 ENGINE UNDER COVER
12. INSTALL NO. 2 ENGINE UNDER COVER
13. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY Installation