Diesel Data: Automotive Repair

Installation








2GR-FE STARTING: STARTER: INSTALLATION

INSTALLATION

1. INSTALL STARTER ASSEMBLY





(a) Install the starter with the 2 bolts.
Torque: 37 Nm (377 kgf-cm, 27ft-lbf)





(b) Connect the starter connector.
(c) Install the terminal nut and cover the nut with the cap.
Torque: 9.8 Nm (100 kgf-cm, 87in-lbf)
2. INSTALL INLET NO. 1 AIR CLEANER Installation
3. INSTALL BATTERY Installation
4. INSTALL INLET NO. 2 AIR CLEANER Installation
5. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
(a) Connect the cable to the negative (-) battery terminal.
NOTICE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.

7. INSTALL COOL AIR INTAKE DUCT SEAL Installation