Diesel Data: Automotive Repair

Installation





2AZ-FE BATTERY / CHARGING: GENERATOR: INSTALLATION

1. INSTALL GENERATOR ASSEMBLY

(a) Install the wire harness clamp bracket with the bolt.





Torque : 8.4 Nm (86 kgf-cm, 74 in-lbf)

(b) Install the generator assembly with the 2 bolts.





Bolt A - Torque : 52 Nm (530 kgf-cm, 38 ft-lbf)

Bolt B - Torque : 21 Nm (215 kgf-cm, 16 ft-lbf)

(c) Install the generator connector and 2 wire harness clamps.





(d) Install the wire harness to terminal B with the nut and install the terminal cap.

Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)

2. INSTALL V-RIBBED BELT Installation

3. INSTALL ENGINE UNDER COVER RH

4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL