Power Source Circuit [12/2019 - 11/2023]: Procedure
- CHECK HARNESS AND CONNECTOR (POWER SUPPLY)
- Disconnect the 4C instrument panel junction block assembly connector.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Condition Specified Condition 4C-1 - Body ground Ignition switch off*1
Always*28.5 V or higher - *1: for HV Model
- *2: for Gasoline Model
Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 2
- INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
- Remove the main body ECU (multiplex network body ECU).
Refer to REMOVAL [12/2019 - 10/2022] , or refer to REMOVAL [10/2022 - 11/2023]
*a Component without harness connected
(Instrument Panel Junction Block Assembly)- - - Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 4C-1 - MB-31 (BECU) Always Below 1 Ω Result
Proceed to OK NG
Result:
OK
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU). Refer to REMOVAL [12/2019 - 10/2022] , or refer to REMOVAL [10/2022 - 11/2023]
Result:
NG
REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY. Refer to REMOVAL [12/2019 - 10/2022] , or refer to REMOVAL [10/2022 - 11/2023]
- Remove the main body ECU (multiplex network body ECU).
