DSD Information System
Home >> Toyota >> 2021 >> Highlander LE, 4WD >> Repair and Diagnosis >> Accessories & Equipment >> Interior/Illumination Lights >> Lighting System (Int) - Diagnostics & Circuit Tests (1 Of 2) >> Lighting System >> IG Signal Circuit [11/2023 - ] >> Procedure

IG Signal Circuit [11/2023 - ]: Procedure

  1. READ VALUE USING GTS 
    1. Read the Data List according to the display on the GTS.

      Body Electrical > Main Body > Data List 

      Tester Display Measurement Item Range Normal Condition Diagnostic Note
      IGR Power Ignition switch ON signal OFF or ON OFF: Ignition switch off
      ON: Ignition switch ON
      -

      Body Electrical > Main Body > Data List 

      Tester Display
      IGR Power

      OK

      Normal conditions listed above are displayed.

      Result

      Proceed to
      OK
      NG

    Result: 

    OK 

    PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE. Refer to  PROBLEM SYMPTOMS TABLE [11/2023 - ]  

    Result: 

    NG 

    See step  2

  2. CHECK HARNESS AND CONNECTOR (POWER DISTRIBUTION BOX ASSEMBLY - POWER SOURCE AND BODY GROUND) 
    1. Disconnect the 8K, 8B and 8C power distribution box assembly connectors.
    2. Measure the voltage according to the value(s) in the table below.

      Standard Voltage

      Tester Connection Condition Specified Condition
      8K-1 - Body ground Always*1
      Ignition switch off*2
      11 to 14 V
      8B-11 - Body ground Ignition switch off Below 1 V
      8B-11 - Body ground Ignition switch ON 11 to 14 V

      *1: for Gasoline Model

      *2: except Gasoline Model

    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance

      Tester Connection Condition Specified Condition
      8B-36 - Body ground Always Below 1 Ω
      8C-41 - Body ground Always Below 1 Ω

      Result

      Proceed to
      OK
      NG

    Result: 

    NG 

    REPAIR OR REPLACE HARNESS OR CONNECTOR 

    Result: 

    OK 

    See step  3

  3. INSPECT POWER DISTRIBUTION BOX ASSEMBLY 
    1. Remove the main body ECU (multiplex network body ECU) from the power distribution box assembly.

      Refer to REMOVAL [11/2023 - ]

    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance

      Tester Connection Condition Specified Condition
      8K-1 - MB-27 (IGR) Auxiliary battery not connected to 8B-11 - 8B-36 or 8C-41 10 kΩ or higher
      8K-1 - MB-27 (IGR) Auxiliary battery positive (+) → 8B-11
      Auxiliary battery negative (-) → 8B-36 or 8C-41
      Below 1 Ω

      Result

      Proceed to
      OK
      NG

    Result: 

    OK 

    REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU). Refer to  REMOVAL [11/2023 - ] 

    Result: 

    NG 

    REPLACE POWER DISTRIBUTION BOX ASSEMBLY. Refer to  REMOVAL [11/2023 - ]