DSD Information System
Home >> Toyota >> 2021 >> Highlander LE, 4WD >> Repair and Diagnosis >> Maintenance >> Procedures >> Maintenance - Service Information (2 Of 2) >> T24A-FTS Battery >> Installation [10/2022 - 11/2023] >> Procedure

Installation [10/2022 - 11/2023]: Procedure

  1. INSTALL BATTERY 
  2. INSTALL NO. 2 BATTERY CLAMP 

    Torque: 18.5 N.m (189 kgf/cm, 14 ft.lbf) 

  3. CONNECT CABLE TO POSITIVE BATTERY TERMINAL 

    Torque: 5.4 N.m (55 kgf/cm, 48 in.lbf) 

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 

    Torque: 5.4 N.m (55 kgf/cm, 48 in.lbf) 

    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Refer to INITIALIZATION [10/2022 - 11/2023]