Precaution [12/2019 - 10/2022]
- INITIALIZATION NOTE:
- Make sure to perform the necessary procedures (adjustment, calibration, initialization, or registration) after parts related to the charging system have been removed/installed or replaced, or the cable has been disconnected from the negative (-) battery terminal.
- When parts related to the charging system have been removed/installed or replaced:
Refer to INITIALIZATION [12/2019 - 09/2020] , or refer to INITIALIZATION [09/2020 - 10/2021] , or refer to INITIALIZATION [10/2021 - 10/2022]
- When the negative (-) battery terminal has been disconnected:
Refer to INITIALIZATION [12/2019 - 09/2020] , or refer to INITIALIZATION [09/2020 - 10/2021] , or refer to INITIALIZATION [10/2021 - 10/2022]
- When parts related to the charging system have been removed/installed or replaced:
HINT:
After charging the battery, perform the integrated current value initialization.
Refer to REGISTRATION [12/2019 - 10/2022]
- Make sure to perform the necessary procedures (adjustment, calibration, initialization, or registration) after parts related to the charging system have been removed/installed or replaced, or the cable has been disconnected from the negative (-) battery terminal.
- CHARGING SYSTEM PRECAUTION NOTE:
- Check that the battery cables are connected to the correct terminals.
- Disconnect the battery cables when the battery is given a quick charge.
- Do not perform tests with a high voltage insulation resistance tester.
- Never disconnect the battery cables while the engine is running.
- Check that the charging cable nuts are tightened on terminal B of the generator assembly and on the No. 1 engine room relay block and No. 1 junction block assembly.