Installation [12/2019 - ]: Procedure
WARNING: This page is about a different variant/trim than selected.
- INSTALL OIL COOLER ASSEMBLY
- w/ Filter:
- Install a new oil control valve filter to the cylinder block sub-assembly.
- Install 2 new oil cooler gaskets to the oil cooler assembly.
- Install the oil cooler assembly to the cylinder block sub-assembly with the 4 bolts.
Torque: 16 N.m (163 kgf/cm, 12 ft.lbf)
- Connect the No. 1 water by-pass hose and No. 2 water by-pass hose to the oil cooler assembly, and slide the 2 clips to secure them.
- w/ Filter:
- ADD ENGINE OIL
Refer to PROCEDURE - Step 5 [12/2019 - 10/2021] , or refer to PROCEDURE - Step 5 [10/2021 - 10/2022] , or refer to PROCEDURE - Step 5 [10/2022 - 11/2023] , or refer to PROCEDURE - Step 5 [11/2023 - ]
- ADD ENGINE COOLANT (for Engine)
Refer to PROCEDURE - Step 2
- CHECK ENGINE OIL LEVEL
Refer to PROCEDURE - Step 1 [12/2019 - 11/2023] , or refer to PROCEDURE - Step 1 [11/2023 - ]
- INSPECT FOR ENGINE OIL LEAK
Refer to PROCEDURE - Step 6 [12/2019 - 10/2021] , or refer to PROCEDURE - Step 6 [10/2021 - 10/2022] , or refer to PROCEDURE - Step 6 [10/2022 - 11/2023] , or refer to PROCEDURE - Step 6 [11/2023 - ]
- INSPECT FOR COOLANT LEAK (for Engine)
Refer to PROCEDURE - Step 3
- INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY
See step 6