DSD Information System
Home >> Toyota >> 2021 >> Highlander LE, 4WD >> Repair and Diagnosis >> Electrical >> Motors, Switches, Relays >> Battery / Charging System (2GR-FKS) - Service Information >> Generator >> Removal [12/2019 - 10/2022] >> Caution / Notice / Hint

Caution / Notice / Hint

The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during generator assembly removal/installation are shown below.

NECESSARY PROCEDURES AFTER PARTS REMOVED/INSTALLED/REPLACED

Replaced Part or Performed Procedure Necessary Procedure Effect/Inoperative Function when Necessary Procedure not Performed Link
Battery terminal is disconnected/reconnected Idle the engine for approximately 5 to 60 minutes or drive the vehicle until stop and start control is permitted Stop and Start System Refer to PRECAUTION [12/2019 - 10/2022]
Perform steering sensor zero point calibration Lane Control System Refer to INITIALIZATION [12/2019 - ]
Parking Support Brake System*1
Pre-collision System
Lighting System (EXT) (w/ AFS)
Memorize steering angle neutral point Parking Assist Monitor System Refer to INITIALIZATION [12/2019 - 10/2022]
Panoramic View Monitor System Refer to INITIALIZATION [12/2019 - 10/2022]
Initialize back door lock Power Door Lock Control System Refer to INITIALIZATION [12/2019 - 11/2023]
Reset back door close position Power Back Door System Refer to INITIALIZATION [12/2019 - 11/2023]

*1: Learning can also be performed using the GTS.

NOTE:

After the ignition switch is turned off, the radio and display receiver assembly or the radio receiver assembly records various types of memory and settings. As a result, after turning the ignition switch off, make sure to wait at least 120 seconds before disconnecting the cable from the negative (-) auxiliary battery terminal.