PTC Heater Circuit [12/2019 - 11/2023]: Procedure
- INSPECT PTC HTR RELAYS
Refer to ON-VEHICLE INSPECTION [12/2019 - 11/2023]
Result
Proceed to OK NG Result:
NG
REPLACE PTC HTR RELAY
Result:
OK
See step 2
- CHECK HARNESS AND CONNECTOR (POWER SOURCE - PTC HTR RELAYS)
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
PTC HTR NO. 1
Tester Connection Condition Specified Condition 3 (PTC HTR NO. 1 relay) - Body ground Ignition switch off 11 to 14 V 2 (PTC HTR NO. 1 relay) - Body ground Ignition switch off Below 1 V 2 (PTC HTR NO. 1 relay) - Body ground Ignition switch ON 11 to 14 V Standard Voltage
PTC HTR NO. 2
Tester Connection Condition Specified Condition 3 (PTC HTR NO. 2 relay) - Body ground Ignition switch off 11 to 14 V 2 (PTC HTR NO. 2 relay) - Body ground Ignition switch off Below 1 V 2 (PTC HTR NO. 2 relay) - Body ground Ignition switch ON 11 to 14 V Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 3
- Measure the voltage according to the value(s) in the table below.
- CHECK HARNESS AND CONNECTOR (PTC HTR RELAYS - AIR CONDITIONING AMPLIFIER ASSEMBLY)
- Disconnect the H62 and H63 air conditioning amplifier assembly connectors.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
PTC HTR NO. 1
Tester Connection Condition Specified Condition 1 (PTC HTR NO. 1 relay) - H62-23 (PTC1) Always Below 1 Ω 1 (PTC HTR NO. 1 relay) or H62-23 (PTC1) - Body ground Always 10 kΩ or higher Standard Resistance
PTC HTR NO. 2
Tester Connection Condition Specified Condition 1 (PTC HTR NO. 2 relay) - H63-16 (PTC2) Always Below 1 Ω 1 (PTC HTR NO. 2 relay) or H63-16 (PTC2) - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 4
- CHECK HARNESS AND CONNECTOR (PTC HTR RELAYS - QUICK HEATER ASSEMBLY AND BODY GROUND)
- Disconnect the G3 and G4 quick heater assembly connectors.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
PTC HTR NO. 1
Tester Connection Condition Specified Condition 5 (PTC HTR NO. 1 relay) - G3-2 (B) Always Below 1 Ω 5 (PTC HTR NO. 1 relay) - G4-1 (B) Always Below 1 Ω 5 (PTC HTR NO. 1 relay) or G3-2 (B) - Other terminals and body ground Always 10 kΩ or higher 5 (PTC HTR NO. 1 relay) or G4-1 (B) - Other terminals and body ground Always 10 kΩ or higher Standard Resistance
PTC HTR NO. 2
Tester Connection Condition Specified Condition 5 (PTC HTR NO. 2 relay) - G4-3 (B) Always Below 1 Ω 5 (PTC HTR NO. 2 relay) or G4-3 (B) - Other terminals and body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 5
- INSPECT QUICK HEATER ASSEMBLY
Refer to INSPECTION [12/2019 - 11/2023]
Result
Proceed to OK NG Result:
OK
REPLACE AIR CONDITIONING AMPLIFIER ASSEMBLY. Refer to REMOVAL [12/2019 - 10/2022] , or refer to REMOVAL [10/2022 - 11/2023]
Result:
NG
REPLACE QUICK HEATER ASSEMBLY. Refer to REMOVAL [12/2019 - 10/2022] , or refer to REMOVAL [10/2022 - 11/2023]