Installation [11/2023 - ]: Procedure
- INSTALL BLIND SPOT MONITOR SENSOR LH
- Connect the connector.
- Install the blind spot monitor sensor LH with the 3 nuts.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- INSTALL BLIND SPOT MONITOR SENSOR RH
- Connect the connector.
- Install the blind spot monitor sensor RH with the 3 nuts.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- PERFORM BLIND SPOT MONITOR SENSOR INSTALLATION CONDITION INSPECTION
See step 4
- INSTALL REAR BUMPER ASSEMBLY
Refer to INSTALLATION [10/2022 - ]
- BSM ECU DATA WRITE NOTE:
BSM ECU data write can only be performed when the beam axis adjustment value is able to be saved to the GTS.
See step 2
- PERFORM BLIND SPOT MONITOR BEAM AXIS CONFIRMATION
See step 3
- PERFORM DIAGNOSTIC SYSTEM CHECK
Refer to DTC CHECK / CLEAR [11/2023 - ]