DSD Information System
Home >> Toyota >> 2021 >> Highlander LE, 4WD >> Repair and Diagnosis >> Accessories & Equipment >> Horns >> Horn System - Service Information >> Horn >> Installation [12/2019 - 09/2020] >> Procedure

Installation [12/2019 - 09/2020]: Procedure

  1. INSTALL LOW PITCHED HORN ASSEMBLY 
    1. Connect the connector.
    2. Install the low pitched horn assembly with the bolt.

      Torque: 23 N.m (235 kgf/cm, 17 ft.lbf) 

  2. INSTALL HIGH PITCHED HORN ASSEMBLY 
    1. Connect the connector.
    2. Install the high pitched horn assembly with the bolt.

      Torque: 23 N.m (235 kgf/cm, 17 ft.lbf) 

  3. INSTALL COOL AIR INTAKE DUCT SEAL 

    Refer to PROCEDURE - Step 4