Daytime Running Light Circuit [12/2019 - 09/2020]: Procedure
- CHECK OPERATION (PARKING LIGHTS)
- Check the operation of the parking lights.
OK
The parking lights operate normally.
Result
Proceed to OK NG
Result:
NG
GO TO PROBLEM SYMPTOMS TABLE. Refer to PROBLEM SYMPTOMS TABLE [12/2019 - 09/2020]
Result:
OK
See step 2
- Check the operation of the parking lights.
- PERFORM ACTIVE TEST USING GTS
- Perform the Active Test according to the display on the GTS.
Body Electrical > Main Body > Active Test
Tester Display Measurement Item Control Range Diagnostic Note Daytime Running Light Daytime running lights OFF or ON - Body Electrical > Main Body > Active Test
Tester Display Daytime Running Light OK
Daytime running lights illuminate.
Result
Result Proceed to OK A NG (w/ Projector Headlight) B NG (w/o Projector Headlight) C
Result:
A
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE. Refer to PROBLEM SYMPTOMS TABLE [12/2019 - 09/2020]
Result:
C
See step 7
Result:
B
See step 3
- Perform the Active Test according to the display on the GTS.
- INSPECT DRL RELAY
Refer to ON-VEHICLE INSPECTION [12/2019 - ]
Result
Proceed to OK NG Result:
NG
REPLACE DRL RELAY
Result:
OK
See step 4
- CHECK HARNESS AND CONNECTOR (POWER SOURCE - DRL RELAY)
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Condition Specified Condition 2 (DRL relay) - Body ground Ignition switch off*1
Always*211 to 14 V 5 (DRL relay) - Body ground Ignition switch off*1
Always*211 to 14 V - *1: for HV Model
- *2: for Gasoline Model
Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 5
- Measure the voltage according to the value(s) in the table below.
- CHECK HARNESS AND CONNECTOR (DRL RELAY - HEADLIGHT ASSEMBLY)
- Disconnect the A66 headlight assembly LH connector.
- Disconnect the A65 headlight assembly RH connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 3 (DRL relay) - A66-3 (B) Always Below 1 Ω 3 (DRL relay) - A65-3 (B) Always Below 1 Ω 3 (DRL relay) or A66-3 (B) - Body ground Always 10 kΩ or higher 3 (DRL relay) or A65-3 (B) - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 6
- CHECK HARNESS AND CONNECTOR (DRL RELAY - INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY)
- Disconnect the 4C instrument panel junction block assembly connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 1 (DRL relay) - 4C-28 Always Below 1 Ω 1 (DRL relay) or 4C-28 - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result:
OK
See step 8
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
- CHECK HARNESS AND CONNECTOR (HEADLIGHT ASSEMBLY - INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY)
- Disconnect the A66 headlight assembly LH connector.
- Disconnect the A65 headlight assembly RH connector.
- Disconnect the 4C instrument panel junction block assembly connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition A66-3 (B) - 4C-28 Always Below 1 Ω A65-3 (B) - 4C-28 Always Below 1 Ω A66-3 (B) or 4C-28 - Body ground Always 10 kΩ or higher A65-3 (B) or 4C-28 - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 8
- INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
*a Component without harness connected
(Instrument Panel Junction Block Assembly)- - - Remove the main body ECU (multiplex network body ECU) from the instrument panel junction block assembly.
Refer to REMOVAL [12/2019 - 10/2022]
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 4C-28 - MB-25 (DRL) Always Below 1 Ω Result
Proceed to OK NG
Result:
OK
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU). Refer to REMOVAL [12/2019 - 10/2022]
Result:
NG
REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY. Refer to REMOVAL [12/2019 - 10/2022]
- Remove the main body ECU (multiplex network body ECU) from the instrument panel junction block assembly.
