DSD Information System
Home >> Toyota >> 2021 >> Highlander LE, 4WD >> Repair and Diagnosis >> Electrical >> Motors, Switches, Relays >> Battery / Charging System (2GR-FKS) - Service Information >> Generator >> Installation [12/2019 - 10/2022] >> Procedure

Installation [12/2019 - 10/2022]: Procedure

  1. INSTALL GENERATOR ASSEMBLY 
    1. Install the No. 1 generator bracket to the generator assembly with the bolt.

      Torque: 20 N.m (204 kgf/cm, 15 ft.lbf) 

    2. Install the wire harness clamp bracket with the bolt.

      Torque: 10 N.m (102 kgf/cm, 7 ft.lbf) 

    3. Install the generator assembly with the 2 bolts.

      Torque: 43 N.m (438 kgf/cm, 32 ft.lbf) 

    4. Type A:
      1. Install the bolt.

        Torque: 20 N.m (204 kgf/cm, 15 ft.lbf) 

    5. Type B:
      1. Install the nut.

        Torque: 20 N.m (204 kgf/cm, 15 ft.lbf) 

    6. Engage the wire harness clamp.
    7. Connect the compressor assembly with magnetic clutch connector.
    8. Connect the generator assembly connector.
    9. Connect the wire harness to terminal B with the nut.

      Torque: 12 N.m (122 kgf/cm, 9 ft.lbf) 

    10. Close the terminal cap.
  2. INSTALL V-RIBBED BELT 

    Refer to INSTALLATION [12/2019 - 10/2022]

  3. INSTALL RADIATOR ASSEMBLY 

    Refer to INSTALLATION [12/2019 - 09/2020] , or refer to INSTALLATION [09/2020 - 10/2022]

  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 

    Refer to PROCEDURE - Step 2