Installation [12/2019 - 10/2022]: Procedure
- INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY (for ACIS)
- Install the No. 1 vacuum switching valve assembly (for ACIS) to the intake air surge tank assembly with the bolt.
Torque: 9.0 N.m (92 kgf/cm, 80 in.lbf)
- Connect the 2 vacuum hose sub-assemblies to the No. 1 vacuum switching valve assembly (for ACIS).
- Connect the No. 1 vacuum switching valve assembly (for ACIS) connector.
- Install the No. 1 vacuum switching valve assembly (for ACIS) to the intake air surge tank assembly with the bolt.
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 52 [12/2019 - 09/2020] , or refer to PROCEDURE - Step 52 [09/2020 - 10/2022]