DSD Information System
Home >> Toyota >> 2021 >> Highlander LE, 4WD >> Repair and Diagnosis >> Suspension >> Front Suspension >> Suspension System (Front) - Service Information >> Front Lower Suspension Arm >> Installation [12/2019 - 10/2022] >> Procedure

Installation [12/2019 - 10/2022]: Procedure

  1. INSTALL FRONT LOWER NO. 1 SUSPENSION ARM SUB-ASSEMBLY 
    1. Install the front lower arm bushing stopper to the front lower No. 1 suspension arm sub-assembly.
    2. Install the front lower No. 1 suspension arm sub-assembly to the front frame assembly with the 3 bolts and nut in the order shown in the illustration.
      Fig 1: Front Lower No. 1 Suspension Arm Sub-Assembly Bolts And Nut Tightening Sequence
      GTY873558Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Bolt (1), (2) 

      Torque: 200 N.m (2039 kgf/cm, 148 ft.lbf) 

      Bolt (3) 

      Torque: 135 N.m (1377 kgf/cm, 100 ft.lbf) 

      NOTE:

      Because the nut has its own stopper, do not turn the nut. Tighten the bolt with the nut secured.

    3. Connect the front lower No. 1 suspension arm sub-assembly to the front lower ball joint assembly with the bolt and 2 nuts.

      Torque: 92 N.m (938 kgf/cm, 68 ft.lbf) 

  2. INSTALL FRONT FENDER APRON SEAL LH 

    for A25A-FXS: Refer to PROCEDURE - Step 60

    for 2GR-FKS: Refer to PROCEDURE - Step 74 [12/2019 - 09/2020] , or refer to PROCEDURE - Step 74 [09/2020 - 10/2022]

  3. INSTALL FRONT FLOOR COVER LH 

    for A25A-FXS: Refer to PROCEDURE - Step 26

    for 2GR-FKS: Refer to PROCEDURE - Step 77 [12/2019 - 09/2020] , or refer to PROCEDURE - Step 77 [09/2020 - 10/2022]

  4. INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY (for A25A-FXS) 

    Refer to PROCEDURE - Step 62

  5. INSTALL REAR ENGINE UNDER COVER LH (for 2GR-FKS) 

    Refer to PROCEDURE - Step 79 [12/2019 - 09/2020] , or refer to PROCEDURE - Step 79 [09/2020 - 10/2022]

  6. INSTALL NO. 1 ENGINE UNDER COVER 

    for A25A-FXS: Refer to PROCEDURE - Step 63

    for 2GR-FKS: Refer to PROCEDURE - Step 80 [12/2019 - 09/2020] , or refer to PROCEDURE - Step 80 [09/2020 - 10/2022]

  7. INSTALL FRONT WHEEL OPENING EXTENSION PAD LH 

    for A25A-FXS: Refer to PROCEDURE - Step 64

    for 2GR-FKS: Refer to PROCEDURE - Step 81 [12/2019 - 09/2020] , or refer to PROCEDURE - Step 81 [09/2020 - 10/2022]

  8. INSTALL FRONT WHEEL OPENING EXTENSION PAD RH 

    for A25A-FXS: Refer to PROCEDURE - Step 65

    for 2GR-FKS: Refer to PROCEDURE - Step 82 [12/2019 - 09/2020] , or refer to PROCEDURE - Step 82 [09/2020 - 10/2022]

  9. INSTALL FRONT WHEEL 

    Refer to PROCEDURE - Step 1

  10. INSPECT AND ADJUST FRONT WHEEL ALIGNMENT 

    Refer to ADJUSTMENT [12/2019 - 09/2020] , or refer to ADJUSTMENT [09/2020 - 10/2022]

  11. PERFORM INITIALIZATION 
    Parking Assist Monitor System Refer to CALIBRATION [12/2019 - 10/2022]
    Panoramic View Monitor System Refer to CALIBRATION [12/2019 - 10/2022]
    Lighting System (EXT) (w/ AFS) Refer to INITIALIZATION [12/2019 - 11/2023]