Installation [09/2020 - 11/2023]: Procedure
- INSTALL NO. 1 CONVERTER CONTROL BRACKET
- Install the No. 1 converter control bracket to the eco run vehicle converter assembly with the 2 bolts.
Torque: 4.5 N.m (46 kgf/cm, 40 in.lbf)
- Install the No. 1 converter control bracket to the eco run vehicle converter assembly with the 2 bolts.
- INSTALL ECO RUN VEHICLE CONVERTER ASSEMBLY
- INSTALL FRONT BUMPER ASSEMBLY
- except Sport Package
Refer to INSTALLATION [09/2020 - ]
- for Sport Package
Refer to INSTALLATION [09/2020 - ]
- except Sport Package
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Refer to PROCEDURE - Step 2 [12/2019 - 10/2022] , or refer to PROCEDURE - Step 4 [10/2022 - 11/2023]
