DSD Information System
Home >> Toyota >> 2021 >> Highlander LE, 4WD >> Repair and Diagnosis >> Accessories & Equipment >> Window Motors & Regulators >> Window / Glass - Service Information >> POWER WINDOW REGULATOR MOTOR (for Front Door) >> Installation [10/2022 - ] >> Procedure

Installation [10/2022 - ]: Procedure

  1. INSTALL POWER WINDOW REGULATOR MOTOR ASSEMBLY 
    NOTE:

    The regulator arm must be below the intermediate position when installing the power window regulator motor assembly.

    1. Using a T25 "TORX" socket wrench, install the power window regulator motor assembly with the 3 screws.

      Torque: 5.4 N.m (55 kgf/cm, 48 in.lbf) 

      HINT: 

      When replacing a power window regulator motor assembly, a new power window regulator motor assembly uses self-tapping screws to thread new installation holes when the self-tapping screws are inserted.

  2. INSTALL FRONT DOOR WINDOW REGULATOR ASSEMBLY 

    Refer to PROCEDURE - Step 23

  3. INSTALL FRONT DOOR GLASS SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 24

  4. INSTALL FRONT DOOR SERVICE HOLE COVER 

    Refer to PROCEDURE - Step 26

  5. INSTALL FRONT DOOR WEATHERSTRIP CLIP 

    Refer to PROCEDURE - Step 27

  6. INSTALL FRONT DOOR TRIM BOARD SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 39

  7. INSTALL COURTESY LIGHT ASSEMBLY 

    Refer to PROCEDURE - Step 2

  8. INSTALL MULTIPLEX NETWORK MASTER SWITCH ASSEMBLY WITH FRONT DOOR UPPER ARMREST BASE PANEL (for Driver Side) 

    Refer to PROCEDURE - Step 42

  9. INSTALL POWER WINDOW REGULATOR SWITCH ASSEMBLY WITH FRONT DOOR UPPER ARMREST BASE PANEL (for Front Passenger Side) 

    Refer to PROCEDURE - Step 43

  10. INSTALL FRONT DOOR INSIDE HANDLE BEZEL 

    Refer to PROCEDURE - Step 41

  11. INSTALL FRONT DOOR LOWER FRAME BRACKET GARNISH 

    Refer to PROCEDURE - Step 44

  12. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL 

    for T24A-FTS:

    Refer to PROCEDURE - Step 4 [10/2022 - 11/2023] , or refer to PROCEDURE - Step 4 [11/2023 - ]

    for A25A-FXS:

    Refer to PROCEDURE - Step 2 [12/2019 - 11/2023] , or refer to PROCEDURE - Step 2 [11/2023 - ]

  13. INSTALL BATTERY SERVICE HOLE COVER (for HV Model) 

    Refer to PROCEDURE - Step 3 [12/2019 - 11/2023] , or refer to PROCEDURE - Step 3 [11/2023 - ]

  14. INITIALIZE POWER WINDOW CONTROL SYSTEM 

    Refer to INITIALIZATION [12/2019 - ]

  15. INSPECT POWER WINDOW OPERATION 

    Refer to OPERATION CHECK [12/2019 - ]