Installation [12/2019 - 10/2021]: Procedure
- INSTALL CYLINDER HEAD GASKET
- Clean the cylinder block sub-assembly and cylinder head sub-assembly with solvent.
- Place a new cylinder head gasket on the cylinder block sub-assembly as shown in the illustration.
*a Lot No. 
Front of Engine NOTE:- Make sure that the cylinder head gasket is installed in the correct orientation.
- Remove any oil from the contact surfaces.
- INSTALL CYLINDER HEAD SUB-ASSEMBLY
Refer to PROCEDURE - Step 19
- INSTALL NO. 2 CAMSHAFT
Refer to PROCEDURE - Step 21
- INSTALL CAMSHAFT
Refer to PROCEDURE - Step 22
- INSTALL CAMSHAFT BEARING CAP
Refer to PROCEDURE - Step 23
- INSTALL VALVE STEM CAP
Refer to PROCEDURE - Step 24
- INSTALL VALVE LASH ADJUSTER ASSEMBLY
Refer to PROCEDURE - Step 25
- INSTALL NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY
Refer to PROCEDURE - Step 26
- INSTALL CAMSHAFT HOUSING SUB-ASSEMBLY
Refer to PROCEDURE - Step 27
- INSTALL FUEL PUMP LIFTER GUIDE
Refer to PROCEDURE - Step 28
- INSTALL TIMING CHAIN COVER ASSEMBLY
Refer to PROCEDURE - Step 31
- INSTALL CAMSHAFT TIMING EXHAUST GEAR ASSEMBLY
Refer to PROCEDURE - Step 32
- SET NO. 1 CYLINDER TO TDC (COMPRESSION)
Refer to PROCEDURE - Step 33
- INSTALL NO. 1 CHAIN VIBRATION DAMPER
Refer to PROCEDURE - Step 34
- INSTALL CHAIN TENSIONER SLIPPER
Refer to PROCEDURE - Step 35
- INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY
Refer to PROCEDURE - Step 36
- INSTALL CHAIN SUB-ASSEMBLY
Refer to PROCEDURE - Step 37
- INSTALL CAMSHAFT TIMING GEAR ASSEMBLY
Refer to PROCEDURE - Step 38
- INSTALL OIL PUMP DRIVE CHAIN SUB-ASSEMBLY
Refer to PROCEDURE - Step 39
- SET NO. 1 CYLINDER TO TDC (COMPRESSION)
Refer to PROCEDURE - Step 31
- INSTALL NO. 2 TIMING CHAIN COVER ASSEMBLY
Refer to PROCEDURE - Step 41
- INSTALL TIMING CHAIN COVER OIL SEAL
See step 1
- INSTALL SPARK PLUG TUBE GASKET
Refer to PROCEDURE - Step 44
- INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 45
- INSTALL WATER BY-PASS OUTLET
Refer to PROCEDURE - Step 46
- INSTALL WATER OUTLET
Refer to PROCEDURE - Step 47
- INSTALL CRANKSHAFT PULLEY ASSEMBLY
Refer to PROCEDURE - Step 48
- CONNECT NO. 2 WATER BY-PASS HOSE
- Connect the No. 2 water by-pass hose to the water by-pass pipe sub-assembly and slide the clip to secure it.
- CONNECT NO. 1 WATER BY-PASS HOSE
- Connect the No. 1 water by-pass hose to the cylinder block sub-assembly and slide the clip to secure it.
- INSTALL CAM TIMING CONTROL MOTOR O-RING
Refer to PROCEDURE - Step 1
- INSTALL CAM TIMING CONTROL MOTOR WITH EDU ASSEMBLY
Refer to PROCEDURE - Step 2
- INSTALL CAM TIMING OIL CONTROL SOLENOID ASSEMBLY
Refer to PROCEDURE - Step 2
- INSTALL OIL PRESSURE CONTROL VALVE ASSEMBLY
Refer to PROCEDURE - Step 1
- INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
Refer to PROCEDURE - Step 2
- INSTALL IGNITION COIL ASSEMBLY
Refer to PROCEDURE - Step 2
- INSTALL DIRECT FUEL INJECTOR ASSEMBLY
Refer to PROCEDURE - Step 2
- INSTALL FUEL DELIVERY PIPE
Refer to PROCEDURE - Step 3
- INSTALL PORT FUEL INJECTOR ASSEMBLY
Refer to PROCEDURE - Step 1
- INSTALL NO. 5 ENGINE WIRE
Refer to PROCEDURE - Step 2
- INSTALL INJECTOR VIBRATION INSULATOR
Refer to PROCEDURE - Step 3
- INSTALL NO. 1 DELIVERY PIPE SPACER
Refer to PROCEDURE - Step 4
- INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 5
- INSTALL NO. 7 WATER BY-PASS HOSE
Refer to PROCEDURE - Step 14
- TEMPORARILY INSTALL FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY (for High Pressure)
Refer to PROCEDURE - Step 1
- TEMPORARILY INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 2
- INSTALL FUEL (ENGINE ROOM SIDE) PUMP ASSEMBLY (for High Pressure)
Refer to PROCEDURE - Step 3
- INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 18
- CONNECT FUEL TUBE SUB-ASSEMBLY
Refer to PROCEDURE - Step 10
- INSTALL NO. 1 INTAKE MANIFOLD TO HEAD GASKET
Refer to PROCEDURE - Step 3
- INSTALL INTAKE MANIFOLD
Refer to PROCEDURE - Step 4
- INSTALL NO. 2 WATER BY-PASS PIPE
Refer to PROCEDURE - Step 22
- INSTALL NO. 3 WATER BY-PASS PIPE
Refer to PROCEDURE - Step 23
- INSTALL EGR VALVE ASSEMBLY
Refer to PROCEDURE - Step 24
- INSTALL NO. 4 WATER BY-PASS HOSE
Refer to PROCEDURE - Step 25
- INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 2
- INSTALL EGR COOLER ASSEMBLY
Refer to PROCEDURE - Step 27
- INSTALL THROTTLE BODY GASKET
Refer to PROCEDURE - Step 1 [12/2019 - 09/2020] , or refer to PROCEDURE - Step 1 [09/2020 - ]
- INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY
Refer to PROCEDURE - Step 2 [12/2019 - 09/2020] , or refer to PROCEDURE - Step 2 [09/2020 - ]
- INSTALL EXHAUST MANIFOLD (TWC: Front Catalyst)
Refer to PROCEDURE - Step 2
- INSTALL MANIFOLD STAY
Refer to PROCEDURE - Step 3
- INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
Refer to PROCEDURE - Step 32
- INSTALL FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY)
Refer to PROCEDURE - Step 33
- INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 34
- INSTALL COMPRESSOR WITH MOTOR ASSEMBLY
Refer to PROCEDURE - Step 35
- INSTALL ENGINE HANGERS
See step 41
- REMOVE ENGINE ASSEMBLY FROM ENGINE STAND
Refer to INSTALLATION [12/2019 - 10/2022]
